Demo: DRAGONFLY demo update

Dear Users! DRAGONFLY demo is coming soon. Please find a final schedule here: demo schedule Keep in mind that we will have two interesting presentations about the system: 7.11 at  1pm – BYI company 14.11. at 10am – Andor company Please do not hesitate to contact us if you need further information. BIF Team

PPMS: Add comments to your bookings!

Dear all, we now found a solution to indicate the ‘importance’ of your slot and to promote communication about experimental details. However: you need to select ‘special environment 2’ before you can leave an comment.  Please use comment field to indicate: your planned duration of your booking (useful when you want to make a prolonged booking but the time did not free up) whether you are life imaging, or rather flexible due to fixed sample in case you booked since system was free anyways, next user can remove sample, etc,… Furthermore, the common agreement for bookings of confocal systems are Read More …

No CO2 in LBE 23.20.2018

Please be informed there is no CO2 available in LBE for the whole days on 23.20.2018 due to a planned ventilation maintenance: 23.10.2018 from 6:00am till 3:00pm Please your experiments accordingly (also overnight experiments!!). Many thanks for your cooperation.

Usage tracker installed on workstations

In response to a constantly increasing number of non-booked usage and no-show events at our analysis workstations, we would like to inform you that from today onwards our workstations are equipped with a usage tracking application. In addition, we inactivated the local ‘imaris’ user profile and you can only use your IST credentials for login. Importantly, please don’t forget to log out from your personal account at the end of your booked slot. Reminder: you are obligated to cancel your bookings in PPMS & send out a SIFFY email as soon as you know that you will not use your session. This allows other users to make Read More …

rearrangement microscopes in room i06.UG.403

While the upgrade of the LSM700 inv in LBE is still in progress, we also rearranged the position of both the LSM880 and LSM700 in LBE to improve your workspace with the new arrangement. Works for the LSM700->800 upgrade are still ongoing today and we planned intros on the new LSM800-2 inv tomorrow – please be aware that it can get crowded during the intros. In addition, all compressed air connections are newly installed and all pressure settings have been reset. Do not make any adjustments to any air outlet!! Please ask for assistance when you do not know which Read More …

Match pinhole option faulty in Zen 2.5

With the introduction of the new ZEN 2.5 software on our new LSM800 systems, we uncovered some things that do not work optimally for us. Most importantly, the ‘Match Pinholes’ does not work, and instead of matching the pinholes to create equal optical sections per wavelength, this option now opens the pinholes completely! Opening the pinhole might overexpose the detectors and damage them: Do not use the ‘match pinhole’ option in ZEN 2.5 when setting up your Z-stack until further notice. We are in contact with Zeiss and ope for a solution soon!

Upgrading LSM700 to 800 systems

We are in the process of upgrading our LSM700 systems to LSM800 systems. All systems will get new lasers, scan heads, computers and the systems will make use of the new ZEN 2.5 software interface. To implement these upgrades  and new features, we are organising a series of introductions. please sign up for the intro timely, so you keep your permission to work on these systems.